data_preparation
Timeline
-
Created by the backend:
-
Moved to the pending or running state on the backend:
-
Failed running on the backend:
-
Time spent running on the backend: 00:00:41
-
Last update by backend:
These timestamps are generated and stored using the UTC timezone on the TPP backend.
Job information
- Status
-
Failed
Job exited with error code 1
If you have VPN access you can view the log output in Airlock, in the workspace file:
metadata/data_preparation.log
- Job identifier
-
a3zvu5gvp7sfuzof
- Job request
- 10175
- Requested by
- Bang Zheng
- Branch
- main
- Backend
- TPP
- Action
-
data_preparation
- Run command
-
stata-mp:latest analysis/data_preparation_and_descriptives.do
- Git commit hash
- cb6e6a5