data_preparation_feasibility
Timeline
-
Created by the backend:
-
Moved to the pending or running state on the backend:
-
Failed running on the backend:
-
Time spent running on the backend: 00:00:14
-
Last update by backend:
These timestamps are generated and stored using the UTC timezone on the TPP backend.
Job information
- Status
-
Failed
Job exited with an error
If you have VPN access you can view the log output in Airlock, in the workspace file:
metadata/data_preparation_feasibility.log
- Job identifier
-
aevf5ia7647xhwe5
- Job request
- 17624
- Requested by
- Bang Zheng
- Branch
- main
- Backend
- TPP
- Action
-
data_preparation_feasibility
- Run command
-
stata-mp:latest analysis/data_preparation_and_descriptives_feasibility.do
- Git commit hash
- d9e5193
- Code comparison
- No previous action runs on this backend available for comparison