Skip to content

data_preparation_feasibility

Timeline

  • Created by the backend:

  • Moved to the pending or running state on the backend:

  • Failed running on the backend:

  • Time spent running on the backend: 00:01:09

  • Last update by backend:

These timestamps are generated and stored using the UTC timezone on the TPP backend.

Job information

Status
Failed

Job exited with an error

If you have VPN access you can view the log output in Airlock, in the workspace file:

metadata/data_preparation_feasibility.log

Job identifier
cft2qdnwddnzxfhf
Job request
23552
Requested by
Bang Zheng
Branch
main
Backend
TPP
Action
data_preparation_feasibility
Run command
stata-mp:latest analysis/data_preparation_and_descriptives_feasibility.do
Git commit hash
9ea45f8