Skip to content

data_preparation_feasibility

Timeline

  • Created by the backend:

  • Moved to the pending or running state on the backend:

  • Failed running on the backend:

  • Time spent running on the backend: 00:00:24

  • Last update by backend:

These timestamps are generated and stored using the UTC timezone on the TPP backend.

Job information

Status
Failed

Job exited with an error

A User has requested this Job is cancelled.

If you have VPN access you can view the log output in Airlock, in the workspace file:

metadata/data_preparation_feasibility.log

Job identifier
pewzugo7r3xgbkoi
Job request
23563
Requested by
Bang Zheng
Branch
main
Backend
TPP
Action
data_preparation_feasibility
Run command
stata-mp:latest analysis/data_preparation_and_descriptives_feasibility.do
Git commit hash
e9961e1