generate_gp_observable_entity
Timeline
-
Created by the backend:
-
Moved to the pending or running state on the backend:
-
Failed running on the backend:
-
Time spent running on the backend: 26:19:12
-
Last update by backend:
These timestamps are generated and stored using the UTC timezone on the TPP backend.
Job information
- Status
-
Failed
Job exited with error code 5: Ran out of memory (limit for this job was 128.00GB)
If you have VPN access you can view the log output in Airlock, in the workspace file:
metadata/generate_gp_observable_entity.log
- Job identifier
-
2tnlmohg6xybz6d4
- Job request
- 10272
- Requested by
- James Farrell
- Branch
- main
- Backend
- TPP
- Action
-
generate_gp_observable_entity
- Run command
-
cohortextractor:latest generate_cohort --study-definition study_definition_gp_observable_entity --index-date-range "2018-12-31 to 2022-05-02 by week" --output-format csv.gz --output-dir=output/data_weekly
- Git commit hash
- 02b6175