Skip to content

dtw_results_4

Timeline

  • Created by the backend:

  • Moved to the pending or running state on the backend:

  • Finished running on the backend:

  • Time spent running on the backend: 00:02:56

  • Last update by backend:

These timestamps are generated and stored using the UTC timezone on the TPP backend.

Job information

Status
Succeeded

Completed successfully

Job identifier
gitywacpx643kwnh
Job request
14227
Requested by
James Farrell
Branch
main
Backend
TPP
Action
dtw_results_4
Run command
r:latest analysis/11_4_DTW_results.R 4
Git commit hash
1002b93