Skip to content

days_to_event_histogram

Timeline

  • Created by the backend:

  • Moved to the pending or running state on the backend:

  • Failed running on the backend:

  • Time spent running on the backend: 00:12:25

  • Last update by backend:

These timestamps are generated and stored using the UTC timezone on the TPP backend.

Job information

Status
Failed

Job exited with an error: Ran out of memory (limit for this job was 128.00GB)

If you have VPN access you can view the log output in Airlock, in the workspace file:

metadata/days_to_event_histogram.log

Job identifier
cuepfn5wyyztqsph
Job request
13846
Requested by
Rochelle Knight
Branch
main
Backend
TPP
Action
days_to_event_histogram
Run command
r:latest analysis/descriptives/histogram_data_post_exposure_days_to_event.R
Git commit hash
43a19fa
Code comparison
No previous action runs on this backend available for comparison