days_to_event_histogram
Timeline
-
Created by the backend:
-
Moved to the pending or running state on the backend:
-
Failed running on the backend:
-
Time spent running on the backend: 00:09:55
-
Last update by backend:
These timestamps are generated and stored using the UTC timezone on the TPP backend.
Job information
- Status
-
Failed
Job exited with an error: Ran out of memory (limit for this job was 128.00GB)
If you have VPN access you can view the log output in Airlock, in the workspace file:
metadata/days_to_event_histogram.log
- Job identifier
-
n5al2fbkkg7uqqn7
- Job request
- 14076
- Requested by
- Rochelle Knight
- Branch
- main
- Backend
- TPP
- Action
-
days_to_event_histogram
- Run command
-
r:latest analysis/descriptives/histogram_data_post_exposure_days_to_event.R
- Git commit hash
- 0a126f9